E2Gold Drills 11.3 G/T Gold Over 1 Metre Within A 17 Metre Interval Grading 1.81 G/T Gold In First Drill Hole Of 2021
![](https://www.e2gold.ca/wp-content/uploads/2021/03/First-Drill-Results-from-the-Hawkins-Gold-Project-1024x640.jpg)
TORONTO, ONTARIO, March 8, 2021 – E2Gold Inc. (TSXV: ETU) (the “Company” or “E2Gold”) is pleased to announce partial assay results from the Company’s first ever drill hole on its Hawkins Gold Project in northern Ontario. Diamond drill hole MK21-001 successully intersected the target McKinnon Zone, verified by a 17 metre interval grading 1.81 g/t […]